Showing posts with label local law 11. Show all posts
Showing posts with label local law 11. Show all posts

Wednesday, August 7, 2013

616 & 620 Building Facade Work

We hope you have had an enjoyable and relaxing summer, and we are excited to welcome you back to campus for the 2013-14 academic year!

Prior to your return to campus, we wanted to let you know that facade inspections are currently being performed on both the 616 and 620 W 116th Street Residence Halls.

These inspections are required by a New York City law called Local Law 11.  Enacted by the city after injuries from falling brickwork, this law requires all buildings 6 stories and taller to have exterior wall inspections and repairs every five years.  This law is the reason that scaffolding around buildings and sidewalk coverings are a constant presence across the city.

Barnard Facilities Services has hired a contractor who specializes in building exterior repairs to perform this work.  Facilities hopes for the work to be completed by early October.  The completion date will be dependent upon weather conditions in New York.

The work will typically begin at 8am and conclude by 4pm, Monday through Saturday.  Scaffolding and sidewalk covers have been erected around both buildings.  The work crew will be repelling down all sides of the buildings to check and work on the facades.

We recommend that you, as much as the weather will permit, keep your windows closed and shades drawn while you are at home and the work is in progress.   This simple suggestion will help to minimize the impact of this work on you and your suitemates.

We will provide students with an update after the academic year has begun and if there is a change in the estimated completion date.

We look forward to seeing you soon!
--
Annie Aversa | Associate Dean of Campus and Residential Life

Wednesday, December 10, 2008

600 W 116th St / Local Law 11 Updates

Dear residents of 600 W 116th Street:

Residential Life and Facilities Services has recently met with the architects and contractors who are guiding the Local Law 11 work on 600 W. 116th St, and we are pleased to let you know that the scheduled completion date for the work being done on the facade of the building is December 22. The sidewalk bridge is scheduled to be removed on December 29. These dates are a bit delayed because of recent rain and cold weather, but the project should be concluded and everything back to normal by the time you return from winter break.

We recognize that this facade work has been an inconvenience to you, and we are very appreciate your patience. Have a happy and healthy holiday and winter break.

Best Wishes,
Facilities Services & Residential Life